Mark 3 Pump Specifications

1.Our pumps could be 100% interchangeble with leading enterprise's Mark III series.

2.The wet ends material like Titanium, Nickel, Hastelloy C, A20, CD4M, 316SS, Cast Steel etc are all available.



  Contact Now
Product Details

Fast and accurate impeller setting with the industry's most innovative external impeller adjustment mechanism.

In-shop reverse vane impeller adjustment with the only pump that takes full advantage of the back pull-out design.


BEARING INSTALLATION 

FOR POWER END ASSEMBLY (CONT'D)


Both bearings have a slight interference fit which requires that they be pressed on the shaft with an arbor or hydraulic press. A chart giving bearing fits is shown in Figure 35. Even force should be applied to the inner race only. Never press on the outer race, as the force will damage the balls and races. An alternate method of installing bearings is to heat the bearings to 200°F (93°C) in an oven or induction heater.Then place them quickly in position on the shaft.


Packing/gland installation

Install the packing rings (#113) and seal cage halves (#112) into the stuffing box as shown in Figure 16. Always stagger the end gaps 90° to ensure a better seal. To speed installation of each ring, have an assistant turn the pump shaft in one direction. This movement of the shaft will tend to draw the rings into the stuffing box. A split gland (#110) is an assembly of two matched gland halves that are bolted together. Unbolt the gland halves and install the gland halves around the shaft. Bolt the halves together to form a gland assembly. Now, install the gland assembly (#110) using studs (#111) and nuts (#111A).Lightly snug up the gland. Final adjustments must be made after the pump has begun operation.

Mark 3 Pump Specifications

Mark 3 Pump Specifications


Product form